Wednesday, May 2, 2012

Eulalia Ave | Alteration and Addition | under construction

 north-east aerial view


 north-west view
view from driveway

interior view from entry
interior view from living area

Its 3rd of May 2012 on site, the whole roof has taken off. loft floor, stud wall frames and engineering steel beams / columns are in place.  

here are some for the guys working hard posing for the picture. 

July 2012 under construction (below) 





Saturday, April 28, 2012

Triplex | moranbah, QLD



Triplex | under construction
the design and development is driven by manufactured panelling system called the 'Integra Eco Pane' system. the system is insulated core sandwich panel construction with in normal stud frame. It has many benifits such as, better sound and thermal insulation, fast installation on site, light and economical, and also efficent for minminise wast and recycle during the manufacture process. It provides good quality housing for less.      

Monday, February 13, 2012

Concept Design and Master Planning | Newcastle HSR Station + University School Complex


View form Courtyard - restaurants, cafes, Uni theatre & Uni Buildings

 View form Auckland Street, Newcastle CBD
HSR Station Roof Construction - Model 
 HSR Station Construction - Model 
HSR Station Structure - Model 
HSR Station Section - Model