north-east aerial view
north-west view
view from driveway
interior view from entry
interior view from living area
Its 3rd of May 2012 on site, the whole roof has taken off. loft floor, stud wall frames and engineering steel beams / columns are in place.
here are some for the guys working hard posing for the picture.
July 2012 under construction (below)